2.11.2019.
Immerhin bleibt uns der Konverter als Kreisverkehrdeko erspart.
Dank an den Sulzbacher Fotografen der lieber ungenannt bleiben möchte.
Tag Archives: OBM Stahlwerk
Maxhütte OBM steel plant under demolition.
Probably the last chance, after the demolition of the LD steel plant of Henrichshütte in Hattingen, to preserve a converter steel plant in Germany is wasted.
The OBM (Oxygen-Bodenblasen-Maxhütte) melt shop in Sulzbach-Rosenberg, built in 1974, with it’s three bottom blowing 65 t converters and the 1200 t hot metal mixer is under demoltion and will soon be gone:
VIDEO Bayrischer Rundfunk.
When the Marcinelle converters were blowing the banks of the Sambre were the place to be.
OBM-steel plant Marcinelle, Belgium, Feb.13th. 2019.
In 1973, after good results with the conversion of the old Thomas (basic Bessemer) plant at Monceau, Forges de Thy-Marcinelle et Monceau ordered a new OBM-steel making shop (Oxygen-Bodenblasen-Maxhütte) from a consortium VÖEST-Alpine–GHH-Sterkrade.The 17500 m² melt shop went into production in April,1976 and included a 2000 t hot metal mixer and three 150 t OBM-converters with 18 tuyeries each.
It was closed down in 2008 and will soon be gone.